Download Print this page

Kohler LITHOCAST Installation Instructions page 4

Freestanding bath

Advertisement

INSTALL THE BATH
A. Plumbing Installation
The drain has been installed onto the bath before it
leaves factory. Fill the bath with water before the bath
is securely positioned so as to check the supply
connections for leaks. Kohler Co. shall not be liable
under its warranty or otherwise for damage caused by
negligence.
Note:
Take extra care to prevent bath bottom and
subfloor from damage.
B. Locate the bath in the proposed position
1.
Lift the stone bath by about 30cm from the floor. You
can support the bath with 30cm-height-blocks
beneath its bottom.
IMPORTANT:
!
The bath must be installed level on all top edges.
Floor should be flat, level and free of any bumps or
protrusions.
2. The drain of the bath is instructed to the bath
beforehand. Please insert the drain hose to the floor
drain, and seal the connection of hose and the floor
drain with silica gel. Please set apart some spare
length of the hose ,in case of future bath
maintainance.
3. Place the bath on the floor. Put the spirit level to the
upper level of the bath to measure the levelness. If
the bath is not level, please put sheet metal under
the bath to raise it up. You might need to lift the bath
several times.
IMPORTANT CONSUMER INFORMATION
Cleaning and Care
Cleaning
LITHOCAST
cleansers on any
LITHOCAST
scratch and dull the surface. Wipe out the bath after
each use to prevent a build-up of soap and scum.
Please consult the user's guide for detail application
and care methods.
1216391-T01-C
Surfaces: Do not use abrasive
surfaces, as they will
A.
B.
1.
30
!
2.
3.
-4-
30

Advertisement

loading