BEFORE YOU BEGIN
·
Please read these instructions carefully to
familiarize yourself with the required tools, materials,
and installation sequences. Follow the sections that
pertain to your particular installation. This will help
you avoid costly mistakes. In addition to proper
installation, read all operating and safety instructions.
·
All information is based on the latest product
information available at the time of publication.
Kohler China Ltd. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
·
These instructions contain important care, cleaning,
and warranty information-
instructions for the consumer.
·
Please provide adequate available space for the
bath unit in accordance with rough-in. Arrange the
location of drain in advance.
·
This product complies with JC/T 644.
IMPORTANT:
All installations must comply with council and local
authority by-laws. It is the responsibility of the installer
to ensure that the waste is made watertight by means
of silicone sealant or caulking compound.
NOTE:
Bath can be installed after the wall is completed.
Bath drain supplies should be arranged preliminarily
according to the selected bath.
PRODUCT REQUIREMENTS
A. Summary Of Key Requirements
·
Observe all local plumbing codes.
·
Install the unit to a level and flat floor.
·
LITHOCAST bath is heavy. Please make sure the
floor provides adequate support for the bath. With its
weight and water consumption marked in the
roughing-in, the bath is supported with four
70mmx70mm squared feet. Please evaluate with the
data above if your floor provides adequate support
for the weight of the bath, water and the user.
KOHLER CHINA INVESTMENT CO., LTD
1216391-T01-C
please leave these
JING'AN DISTRICT, SHANGHAI, PRC
(
)
LITHOCAST FREESTANDING BATH
·
·
·
·
·
JC/T 644
A.
·
·
·
4 70mmx70mm
NO.158, JIANG CHANG SAN ROAD,
POST CODE: 200436
158
©
Copyright Kohler China Investment Co., Ltd. 2017
-1-
©
INSTALLATION INSTRUCTIONS
200436
2017