Installing Feed Rolls; Loading The Wire Spool - Lincoln Electric PWF-2 Operator's Manual

Table of Contents

Advertisement

B-1
 INSTALLING FEED ROLLS
PWF™-2: One reversible drive roll needs to be installed on each PWF
two different size grooves for feeding different diameter wire. One groove is for feeding 0.8/1.0/1.2mm and the other
groove is for feeding 1.0/1.2/1.6mm. Ensure that the drive roll is installed using the correct groove for the wire diameter
being used.
PWF™-4: Two reversible drive rolls need to be installed on each PWF
two different size grooves for feeding different diameter wire. One groove is for feeding 1.0/1.2mm and the other groove
is for feeding 1.2/1.6mm. Ensure that the drive roll is installed using the correct groove for the wire diameter being used.
Notice: make sure the specifications of the 2 symmetrical feed rolls are same. And don't make any mistake about it!
 LOADING THE WIRE SPOOL
PWF™-2
Loosen the retainer on the spindle and put on the welding wire spool. Next, replace the retainer and tighten the screw.
Release the pressure handle and lift the pressure arm, then insert the welding wire into the inlet straightening rolls 2-3cm (1
inch). Now, replace the pressure arm and tighten with the pressure handle noting that the pressure scale should suit the
wire diameter. Using the cold-inch button on the feeder, begin feeding wire. Release the cold-inch button when the wire
comes out 1-2cm (1/2-1 inch) from the contact tip. The installation of the welding wire is now completed.
OPERATION
TM
-2 wire feeder. Normally each drive roll has
TM
-2 wire feeder. Normally each drive roll has
B-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pwf-2 plusPwf-4Pwf-4 plus

Table of Contents