Upper Shaft Mechanism - Brother BAS-326G Service Manual

Direct drive programmable electronuc pattern sewer
Hide thumbs Also See for BAS-326G:
Table of Contents

Advertisement

6-8. Upper shaft mechanism

1) Tighten the screw of the thread take-up crank so that
it is aligned with the upper shaft hole.
2) While pressing the thread take-up crank so that there
is no play in it, tighten the two set screws (8).
Apply adhesive (Threebond 1401 or similar) to the thread
section of the screw.
Install the bobbin winder driving
wheel so that it is in phase with the
thread take-up crank and aligned
with the reference line on the upper
shaft.
BAS-311G, BAS-326G
Apply adhesive (Threebond 1324 or similar) to the
outside of the bearing of joint assy.
1. Upper shaft
2. Pulley gear R
3. Bobbin winder driving wheel
4. Stepping clamp cam assy
5. Thread take-up crank
6. Screw
7. Set screw
8. Set screws [2 pcs]
9. Set screws [2 pcs]
10. Rubber cap
11. Set screws [2 pcs]
12. Joint assy
13. Set screws [2 pcs]
6. ASSEMBLY
5140Q
Reference line
5204Q
75

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Bas-311g

Table of Contents