General; Model Designation - Yazaki AROACE Installation Instructions Manual

Water-fired single-effect absorption chiller
Hide thumbs Also See for AROACE:
Table of Contents

Advertisement

This
equipment
installed
by
trained
personnel
who
absorption chillers.
these instructions as well as on tags and
labels attached to the unit must be
observed
to
ensure
personnel and to maintain warranty
validation.
Each Yazaki absorption chiller has
been evacuated, charged with lithium
bromide and water solution, and run
tested prior to leaving the factory.
Piping connections are all located at
the rear of the unit.
After
the
equipment
installed, a Yazaki Authorized Service
Provider
(ASP)
installation and supervise or conduct the
initial startup and operation of the unit.
Water-Fired Chiller
Cooling Only Design
Cooling Capacity: 5 rated tons

GENERAL

should
only
be
and
qualified
are
familiar
with
All precautions in
the
safety
of
has
been
must
check
the

MODEL DESIGNATION

CAUTION
THE
YAZAKI
VOIDED
IF
RESTRICTIONS ARE NOT OBSERVED:
1. DO NOT OPEN ANY SERVICE VALVES
WITHOUT
A
ASSEMBLY ATTACHED TO THEM AS SUCH
ACTION
WILL
VACUUM AND INTRODUCTION OF GASES
TO THE INTERIOR OF THE MACHINE
WHICH COULD CAUSE CORROSION.
2. ALWAYS HANDLE THE EQUIPMENT WITH
CARE
AND
VERTICAL POSITION DURING RIGGING. IF
THE
EQUIPMENT
CAREFULLY
PROVIDED WITHIN THIS DOCUMENT.
3. DO
NOT
ATTEMPT
SYSTEM WITHOUT SUPERVISION FROM A
YAZAKI AUTHORIZED SERVICE PROVIDER
.
(ASP)
WFC-S
2
WARRANTY
WILL
THE
FOLLOWING
PROPER
EVACUATION
RESULT
IN
LOSS
MAINTAIN
IN
A
NEAR-
MUST
BE
TILTED,
FOLLOW
INSTRUCTIONS
TO
START
C
5
BE
OF
THE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wfc-sc5

Table of Contents