Installing the Switch
Figure 19: Locations of Screw Holes for Alternate Chassis Installation Positions
1
Left L bracket already attached. When the chassis
is installed, the front of the chassis is
approximately flush with the front of the rack.
2
Right L bracket already attached. When the
chassis is installed, the front of the chassis is
approximately flush with the front of the rack.
Step 2
With a person standing at each side of the chassis, each person supports the chassis by placing one hand in
the handhold on the side of the chassis (see figure above) and using the other hand under the back of the
chassis for balance. Slowly lift the chassis together. Avoid sudden twists or moves to prevent injury.
Step 3
Rest the back end of the chassis on the rack-mount shelf and carefully slide the chassis into the rack until the
L brackets meet the front rails of the rack system.
Step 4
Locate the rack post holes that align with the chassis L bracket holes. If the rack post holes are prethreaded,
determine if the threads are 10-32 or 12-24. If the rack post holes are unthreaded, install eight or ten (four or
OL-30827-02
◦ Secure the brackets with the screws.
Rack Mouting the Chassis
3
Screw holes for reattaching the L brackets. When
the chassis is installed, approximately one quarter
of it protrudes in front of the rack.
4
Screw holes for reattaching the L brackets. When
the chassis is installed, approximately one half
of it protrudes in front of the rack.
Catalyst 6880-X Switch Hardware Installation Guide