Scotsman SCCG30 Service Manual page 28

Scotsman ice systems ice maker user manual
Hide thumbs Also See for SCCG30:
Table of Contents

Advertisement

15. Lift evaporator platen up and tilt back enough
for bin assembly to clear the base.
16. Remove air baffle.
17. Unplug wire harness connector (at back of bin).
18. Remove 1 screw at each corner of the base.
19. Lift bin assembly off the base.
Note: Prop evaporator assembly up. A 3' length of
3/4" PVC tubing with one end inserted into the cup
mold and the other against the base will hold it up.
The hot gas valve, fan motor, condenser and
compressor are now exposed for service.
Air Baffle
September 2009
Page 28
SCCG30 & SCCP30
Service Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sccp30

Table of Contents