26

PRE-COMMISSIONING CHECKS

A
B
C
PRE-COMMISSIONING
CHECKS
CAUTION: ISOLATE THE MAINS
SUPPLIES BEFORE STARTING ANY
WORK AND OBSERVE ALL
RELEVANT SAFETY PRECAUTIONS
1 Check that the service and water pipes are
2 Check the gas type specified on the
NOTE: Do not use solvents, adhesive or
3 Check that the condensate pipe (D) has
IMPORTANT: If the boiler is not to be
commissioned immediately then:
after successfully completing all of the
checks and any rectification work,
close the gas and water valves, shut off
the gas supply and electrically isolate
the boiler.
D
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR Ri
connected to the correct position on the
manifold.
A - Flow (22mm)
B - Return (22mm)
C - Gas inlet (22mm)
identification plate matches that of the gas
supply. Turn on the main gas supply, check
the gas pipework, connections and rectify
any leaks.
lubricant when pushing the pipe
onto the rubber connector.
been connected to the syphon.
8 716 115 168a (06/2008)