Commissioning notes
Safety check to be carried out
a) Burner startup with previously inter-
rupted line to the flame detector
b) Burner operation with simulated loss of
flame. For that purpose, cut off the fuel
supply
c)
Burner operation with simulated air
pressure failure
4/25
Building Technologies
HVAC Products
•
When commissioning the plant for the first time or when doing maintenance work,
make the following safety checks:
LME11... / LME41.051...:
Max. 3 repetitions
LME2... / LME41.052... / LME41.053... / LME41.054... / LME41.071...
/ LME41.09... / LME44...:
Lockout at the end of «TSA»
LME11... / LME41.051...:
•
Establishment of flame at the end of «TSA» → Max. 3 repetitions
•
No establishment of flame at the end of «TSA» → Lockout
LME2... / LME44...:
Lockout
LME41.052... / LME41.053... / LME41.054... / LME41.071... /
LME41.09...:
Repetition
Immediate lockout
LME41...:
Safety shutdown / restart
Anticipated response
CC1N7101en
27.11.2008