Checklist For Power-On; Power-On Procedure - Cisco 450 Hardware Installation Manual

Voice gateway
Table of Contents

Advertisement

Powering On the Cisco VG450 Voice Gateway
To power on your Cisco VG450 Voice Gateway, perform the following tasks in the order listed, as required:

Checklist for Power-On

You can power on a Cisco VG450 Voice Gateway if it meets the requirements described in Chapter 3: Installing
the Cisco VG450 Voice Gateway.
• The chassis is securely mounted.
• Power cable is connected.
• Interface cables are connected.

Power-On Procedure

Perform this procedure to power on your Cisco VG450 Voice Gateway, and verify that it goes through its
initialization and self-test. When this is finished, the Cisco VG450 Voice Gateway is ready to configure.
Danger
This unit might have more than one power supply connection. All connections must be removed to de-energize
the unit. Statement 1028
Danger
Installation of the equipment must comply with local and national electrical codes. Statement 1074
To power on the Cisco VG450 Voice Gateway, perform the following:
SUMMARY STEPS
1. Power on your terminal or PC, and configure it for 9600 bps, 8 data bits, 1 stop bit, and no parity.
Checklist for Power-On, on page 25
Power-On Procedure, on page 25
Troubleshooting, on page 27
C H A P T E R
Cisco 450 Voice Gateway Hardware Installation Guide
4
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents