Download Print this page

Before Installation - Rinnai HD250i Installation Instructions Manual

Direct flueing with wall terminal
Hide thumbs Also See for HD250i:

Advertisement

HD250i Direct Flueing - Kit / Important
Direct Flueing - Kit Components
Flue Terminal
Chamber
Screw Kit (in actual kit, screw components are packaged in a clear plastic roll pack)
Tapping Screws (ø 3.8 x L32)
Screw (M4)
Trim Nut (M4)
Important Installation Notes
The components of this flueing system CAN NOT BE CUT, use telescopic components to achieve the
required length
Ensure positioning of the flue terminal and flue installation comply with NZS:5261. The flue
products can reach temperatures above 200
Flue must be supported and be independent of the appliance
Ensure the appliance can be removed without causing movement or displacement of the flue
Flue components are self-locking
The O-Rings in all the components are pre-greased, ensure they are not damaged when joining
When preparing the wall penetration, cover flue spigot to prevent debris from entering the
appliance

Before Installation

Wall hole diameter is Ø75mm or greater and is secure
That there is a 2
angled fall to the flue terminal
o
Length of sleeve tube has been checked, wall thickness can be 150 - 250mm thick
Distance to surroundings of the flue terminal as per NZS:5261
Rinnai New Zealand
Sleeve
Butterfly Nuts (M5)
Screw Plugs (#10)
C.
o
3
Condensate Proof Cover
HD250i Flueing Installation: 0-07

Advertisement

loading