Payne PG9YAA036060 Installation Instructions Manual page 15

Pg9yaa series. 95% single stage direct or non ---direct vent gas furnace upflow / horizontal
Table of Contents

Advertisement

PIPE DIAMETER TABLE
PG9YAA MODEL
60,000 BTUH Furnaces
40' & (5) 90° elbows with 2" PVC pipe or
70' & (5) 90° elbows with 3" PVC pipe
80,000 BTUH Furnace
40' & (5) 90° elbows with 2" PVC pipe or
40' & (5) 90° elbows with 3" PVC pipe
100,000 BTUH Furnace
30' & (4) 90° elbows with 2" PVC pipe or
40' & (5) 90° elbows with 3" PVC pipe
Elbows are DWV Long Radius Type for 2
If more than five elbows are required, reduce the length of both the
inlet and exhaust pipes 5' for each additional elbow used. If less than
five elbows are required, the length can be INCREASED by 5' for each
additional elbow NOT used.
Table 3 – Pipe Diameter Table
NOTE: It is allowable to use larger diameter pipe and fitting
than shown in the tables but not smaller diameters than shown.
For "Concentric Termination Kit" Venting see Table 4 in
this manual.
Vent Termination Clearances
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or
death.
Inlet and outlet pipes may NOT be vented directly above each
other.
1. Determine termination locations based on clearances spe-
and 3
vents.
"
"
For "Concentric Termination Kit" clearances, see Fig. 28
through Fig. 33 in this manual.
2. For Single Pipe Installation refer to Fig. 8 for vent termin-
3. For Direct Vent Installation refer to Fig. 7 for vent termin-
15
WARNING
!
cified in following steps and as shown in Fig. 7, Fig. 8,
Fig. 19 through Fig. 27.
ation clearances.
ation clearances.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pg9yaa048080Pg9yaa036080Pg9yaa060100

Table of Contents