Mira Sport Installation, Operation, Maintenance Manual page 15

10.8 kw electric showers
Hide thumbs Also See for Sport:
Table of Contents

Advertisement

1.10. Drill and plug the top two fixing holes. Secure the Mira Sport to the wall with
the screws provided. Drill the bottom fixing hole with the product in place.
Alternative fixings (not supplied) may be necessary for some wall structures.
Avoid drilling into any supply cable/pipe.
1.11. Install the mains-fed cold water supply pipe.
1.12. Make the connection to the mains-fed cold water supply pipe.
1.13. Bring the electrical supply cable into the case through one of the cable entry
points.
1.14. Strip back sufficient of the outer cable insulation to enable routing to terminal
block.
1.15. Fit an earth sleeve to the earth conductor. Connect the conductors firmly into
the terminal block. Make sure that the bare cores of each conductor are
securely trapped within each conductor clamp.
L = Red wire
N = Black wire
E = Yellow/Green sleeved wire.
1.16. Re-tighten the terminal block screws.
1.17. If necessary, fit an earth bonding clamp to the copper supply pipe and ensure
bonding complies with relevant regulations in force at the time of installation.
1.18. Refit the cover. Fit and tighten the three cover retaining screws.
1.19. Fit the shower fittings. Refer to separate instructions.
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents