Verifying the installation
After you complete the installation, verify that:
There is enough space for heat dissipation around the switch, and the rack is stable.
•
•
The grounding cable is securely connected.
The correct power source is used.
•
The power cords are correctly connected.
•
All the interface cables are cabled indoors. If any cable is routed outdoors, verify that the socket
•
strip with lightning protection and lightning arresters for network ports have been correctly
connected.
20