Installation - Vaillant auroTHERM VFK 145/2 H Installation Manual

Multi-row in-roof mounting
Table of Contents

Advertisement

5 Assembly
The entire installation area consists of the dimensions
for the collector array (A) and (B) and also the addi-
tional exposed area (C).
i
The additional exposed area (C) is needed in
order to be able to carry out the installation
work. After assembly the additional exposed
area (C) is covered up again.
5.5

Installation

Multi-row in-roof mounting of Vaillant flat collectors is
always carried out in vertical rows. The flat collectors
have a horizontal orientation (VFK H) or a vertical orien-
tation (VFK V). They are arranged on top of one another
and next to one another in a collector array:
– 2 to 12 collectors next to one another
– 2 or more collectors on top of one another
(depending on roof height)
Furthermore, with the VFK H it is only possible to mount
two collectors on top of one another.
Generally, the installation steps and the instructions
described in this manual are valid for both collector
positions and for all array arrangements.
Any different installation steps are clearly pointed out:
w
Only for the horizontal collector position
s
Only for the vertical collector position
Only when two VFK Hs are on top of one
another
18
Installation manual auroTHERM 0020100606_02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents