Operation; Unpacking And Inspection; Storage; Battery Installation/Replacement - Fluke Victoreen 190 Operator's Manual

Survey and count rate meter
Table of Contents

Advertisement

3.1 Unpacking and Inspection

Upon receipt of the unit:
1. Inspect the carton(s) and contents for damage. If damage is evident, file a claim with the carrier
and notify Fluke Biomedical, Radiation Management Services at 440.248.9300.
2. Remove the contents from the packing material.
3. Verify that all items listed on the packing list have been received and are in good condition.

3.2 Storage

If the unit is to be stored prior to use, pack it in the original container(s), if possible, and store in an
environment free of corrosive materials, fluctuations in temperature and humidity, and vibration and
shock.

3.3 Battery Installation/Replacement

Four 9-volt alkaline batteries are supplied with the Model 190. The battery compartment is located on the
back of the instrument. The compartment will hold up to four batteries. All four batteries must be in place
for proper operation and to avoid damage to the instrument. Use the following procedure to
install/replace the batteries:
1. Loosen the two-quarter turn fasteners securing the battery compartment cover to the back panel.
If any of the listed items are missing or damaged,
notify Fluke Biomedical at 440.248.9300.
To prevent battery leads from shorting on the
battery compartment's conductive coating, Ensure
that all four batteries are INSTALLED at all times.
Unit power must be left ON and batteries replaced
one at a time to prevent data loss when the log
mode is activated and logged data is to be
retrieved.
NOTE
CAUTION
CAUTION

Operation

Unpacking and Inspection
Section 3
Operation
3
3-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents