3. Bundle the piping and drain hose together by
wrapping them with vinyl tape over the range
within which they fit into the rear piping
housing section.
CAUTION: Installation Information (For right piping)
For right piping, follow the instruction below.
Good case
• Press on the upper side of clamp and unfold
the tubing to downward slowly.
Connection of piping - Outdoor
Align the center of the piping and sufficiently
tighten the flare nut by hand.
Connecting pipe order
1) A~E-UNIT gas side pipe
2) A~E-UNIT liquid side pipe
Finally, tighten the flare nut with torque wrench
until the wrench clicks.
• When tightening the flare nut with torque
wrench ensure the direction for tightening
follows the arrow on the wrench.
Outside diameter
mm
inch
Ø6.35
Ø9.52
Ø12.7
Ø15.88
Ø19.05
Torque
kgf . m
1/4
1.8~2.5
3/8
3.4~4.2
1/2
5.5~6.6
5/8
6.3~8.2
3/4
9.9~12.1
Flaring Work and Connection of Piping
Wrap with vinyl tape
Pipe
Drain hose
Bad case
• Following bending type from left to right could
cause problem of pipe damage.
Outdoor unit
Liquid
side piping
Vinyl tape(wide)
Gas side piping
A-UNIT
B-UNIT
C-UNIT
D-UNIT
E-UNIT
Main gas
side valve
Main liquid
side valve
Installation Manual 17