Huffy 211376A Owner's Manual page 6

In-ground basketball system
Table of Contents

Advertisement

6.
Insert ground sleeve (4) and pole section (3) into hole. Fill
remaining hole with concrete. Tamp down concrete to
release air pockets and build drainage hill. Center and level
ground sleeve assembly in hole. Check leveling on all sides
several times while concrete is curing. NOTE: Make sure
concrete is set up to clamp assembly as shown below.
1" (2.54 cm)
IMPORTANT!
WAIT MINIMUM OF 24 HOURS
BEFORE GOING ON TO NEXT STEP.
CONCRETE MUST CURE.
P/N 211376A
05/03
* PLAYING SURFACE
* PLAYING
SURFACE
3
FILL TO
HERE
4
6
IMPORTANT!
FRONT OF POLE MUST BE PARALLEL WITH
PLAYING SURFACE.
7.
After concrete cures, remove clamp
assembly and lift bottom pole section (3)
from ground sleeve (4) as shown.
4
3

Advertisement

Table of Contents
loading

Table of Contents