Basic Commissioning With Starter; Generating A Starter Project - Siemens SINAMICS G120D Operating Instructions Manual

Control units, distrubuted converter
Hide thumbs Also See for SINAMICS G120D:
Table of Contents

Advertisement

Commissioning

5.5 Basic commissioning with STARTER

5.5
Basic commissioning with STARTER
STARTER and STARTER screen forms
STARTER is a PC-based tool to commission Siemens inverters. The graphic user interface
of STARTER supports you when commissioning your inverter. Most inverter functions are
combined in screen forms in STARTER.
The STARTER screen forms that are shown in this manual show general examples. The
number of setting options available in screen forms depends on the particular inverter type.
Preconditions for basic commissioning
You require the following to commission the inverter using STARTER:
● An installed drive (motor and inverter)
● A computer with Windows XP or Windows 7
● The latest version of STARTER. STARTER download
(http://support.automation.siemens.com/WW/view/en/10804985/133100)
● An appropriate USB cable. If you are not using the USB interface, but the PROFINET
interface of the inverter, you can find information in section: Manuals for your converter
(Page 292).
Overview of basic commissioning
Commissioning using STARTER includes the following basic steps:
1. Create a STARTER project
2. Integrate an inverter into the project
3. Go online and start basic commissioning
4. Carry out basic commissioning
5. Identify motor data
Steps 1-5 are described below.
5.5.1

Generating a STARTER project

Procedure
In order to create a new project, proceed as follows:
1. In the STARTER menu, select "Project" → "New...".
2. Specify a name of your choice for the project.
You have created a new STARTER project.
68
Converter with control units CU240D-2
Operating Instructions, 04/2014, FW V4.7, A5E34262100B AA

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu240d-2

Table of Contents