Installation Instructions; Overview Of Installation Process After Survey; Run System Wiring; General Guidelines - Bosch SE3000 Series Hardware Installation Manual

Security escort
Hide thumbs Also See for SE3000 Series:
Table of Contents

Advertisement

Security Escort
4

Installation instructions

4.1

Overview of installation process after survey

This section includes information about the installation and setup of the individual
components and system wiring. It is recommended that the installation instructions that
accompany each specific component be consulted prior to beginning any phase of the
installation.
A typical installation proceeds in the following order:
1.
2.
3.
4.
Notice!
Use the SE Coordinator Information Sheet, located in the Appendix of this document, to keep
track of SE receiver addresses and location for programming the Transponder Database.
5.
6.
4.2

Run system wiring

4.2.1

General guidelines

After the site survey (and special pre-installation verifications) has been completed, the wiring
can be run between the proposed locations of the system components and the Central
Console. See specific installation instructions accompanying each component for wiring
details.
The following table indicates the specifications for the wiring:
From
SE
coordinator /
SE receiver
SE coordinator Host PC
Tab. 4.1: Specifications for Wiring
Robert Bosch (SEA) Pte Ltd
The site survey is completed, indicating the proposed location of each component.
Wiring runs to all of the proposed component locations and the Central Console.
Empty enclosures are installed as specified in the site survey.
The components are secured inside the enclosures and connected to the previously run
wiring. The individual components are set up and their addresses recorded.
The recorded addresses are entered into the Central Console and the system is brought
on-line.
The system is tested and tuned up as needed.
To
SE receiver
Power
Supply
Input 1 or 2
Output 1 or 2 I/O
Hardware Installation Manual
Signal Type Gauge
RS-485
#24
Power
#18
#24
I/O
#18
#18
Ethernet /
Cat5e
PoE
UTP
Installation instructions | en
Max. Length Remark
1000 m per
Twisted pair Cat5e
bus
cable recommended.
Shielded cable may
be required for
outdoor use.
Please refer to the sections below
for detailed specification.
15 m
Solid, not twisted, not
shielded
15 m
Solid, not twisted, not
shielded
100 m
Shielded cable may
be required for
outdoor use
2018.03 | SE3v1.0 | DOC