1
Installation manual
1.6
Measurements, clearances and accesses
General dimensions, VIR 75A and VIR 90A
A
B
3
4
5
A.
Minimum clearance 600 mm
B.
Minimum clearance 800 mm
1.
Gas connection 1 ⅛" (x2)
2.
Liquid connection 7/8" (x2)
3.
Hot water coil accessory connections
4.
Electrical connections
5.
Motor access panel
6.
Filters
7.
Drain pipe (outer diameter 28.5 mm)
N O T E
Measurements in mm
22
A
21
1
2
6
7