Ground Cable - Dell Virtual Edge Platform 4600 Setup Manual

Table of Contents

Advertisement

Two-post rail kit, no tools required
One or two AC PSUs, depending on the configuration
Five AC normal fan units
One or two country- and region-specific AC power cords, depending on the
configuration
Ground lug kit (included in the accessories box)
VEP4600 Setup Guide
Safety and Regulatory Information
Warranty and Support Information
1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container.
3
Carefully remove the platform from the container and place it on a secure and clean
surface.
4
Remove all packing material.
5
Inspect the product and accessories for damage.

Ground cable

To attach a ground cable to the switch, use the included two M3 ground lug bracket screws.
The switch ships with the M3 ground lug bracket screws attached.
NOTE:
For AC-powered platforms, although the third conductor of the AC power
cord provides a ground path, Dell EMC recommends grounding your platform with a
dedicated ground wire.
The ground cable is not included. To properly ground the platform, Dell EMC recommends a
one- or two-hole lug, M3 hole size. The ground lug must be a UL-recognized, crimp-type lug.
CAUTION:
Grounding conductors
conductors.
NOTE:
Coat the one-hole lug with an anti-oxidant compound before crimping. Also,
bring any unplated mating surfaces to a shiny finish and coat with an anti-oxidant
before mating. Plated mating surfaces must be clean and free from contamination.
NOTE:
The rack installation ears are not suitable for grounding.
must be made of copper. Do not use aluminum
VEP4600 installation
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vep4600

Table of Contents