Inspection and maintenance
No.
items
1
Unit and base connection
Check tightness of bolt
1.1
connections between unit and
base
Check the wearing condition
1.2
of the absorbtion gasket
between unit and base
2
Unit box body
Check the scale, damage and
2.1
corrosion of the unit box body
3
Filter
Check the scale, damage and
3.1
corrosion
Check the pressure difference
3.2
at both sides
4
Coil
Check the scale, damage and
4.1
corrosion
4.2
Check the ability state
Check the connection leakage
4.3
between inlet and outlet pipe
5
Water baffle, drain pan
5.1
check water baffle
Check the draining state of
5.2
the drain pan
6
Heat exchanger
6.1
Plate heat recovery
Check the scale, damage and
6.1.1
corrosion
Check the fresh air and return
6.1.2
air for serialization
6.2
Wheel heat recovery
Check the balance of the
6.2.1
wheel
Check the drive working
6.2.2
condition
Tab. 6-1 Inspection and maintenance items 1
Climate 5000
Maintenance measures
Tighten if necessary
Replace if necessary
Clean and rectify
Clean and rectify
When the clean filter
resistance exceeds the
maximum allowable value,
replace the filter
Clean and rectify
Seal if necessary
Clean
Clean and rectify
Rectify
Adjust if necessary
Unit maintenance | 17
1
3
6
1
2
M
M
M
Y
Y
Remarks
Inspection and
maintenance
intervals
◆ ◆
According
to the
operating
★ ★ ★
condition
△ ◆
8736862495(2015/07)