Installation Checklist - Rheem PVR50-80 (NAT) Use And Care Manual

Residential 30, 38, 40 and 50 gallon gas water heaters
Table of Contents

Advertisement

Installation Checklist

A. Water Heater Location
B. Water Supply
C. Gas Supply
D. Relief Valve
E. Venting
14
Close to area of vent.
Indoors and protected from freezing
temperatures.
Proper clearance from combustible surfaces
observed and water heater not installed on
carpeted floor.
Sufficient fresh air supply for proper
operation of water heater.
Air supply free of corrosive elements and
flammable vapors.
Water heater completely filled with water.
Air purged from water heater and piping.
Water connections tight and free of leaks.
Gas line equipped with shut-off valve, union
and sediment trap.
Approved pipe joint compound used.
Temperature and Pressure Relief Valve
properly installed and discharge line run to
open drain.
Discharge line protected from freezing.
Flue baffle properly hung in top of heater's
flue.
Draft hood properly installed.
Vent connector(s) pitched upward to chimney
(¼" per foot of length minimum) .
Provisions made to protect area from water
damage.
Sufficient room to service heater.
Combustible materials, such as clothing,
cleaning materials, rags, etc. clear of the base
of the heater.
Clearances from combustion air inlet
openings observed (see page 7).
Soap and water solution used to check all
connections and fittings for possible gas leak.
Gas Company inspected installation (if
required).
Vent connector(s) securely fastened together
with screws.
Single wall vent connector(s) at least 6" from
combustible material.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pvr 50-8022v40f130 gallon38 gallon40 gallon50 gallon

Table of Contents