Step 1: Mount The Transmitter - Emerson Rosemount 2051 Series Quick Start Manual

Pressure transmitter and flowmeters, with 4-20ma hart and 1-5vdc low power hart protocol revision 5 and 7
Hide thumbs Also See for Rosemount 2051 Series:
Table of Contents

Advertisement

Quick Start Guide

Step 1: Mount the transmitter

Liquid applications
1. Place taps to the side of the line.
2. Mount beside or below the taps.
3. Mount the transmitter so that the drain/vent valves are oriented upward.
Figure 2. Liquid applications
A
A. Coplanar
B. Inline
Gas applications
1. Place taps in the top or side of the line.
2. Mount beside or above the taps.
Figure 3. Gas applications
B
A
A. Coplanar
B. Inline
Steam applications
1. Place taps to the side of the line.
2. Mount beside or below the taps.
3. Fill impulse lines with water.
Figure 4. Steam applications
A
A. Coplanar
B. Inline
4
B
B
May 2013

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rosemount 2051cf series

Table of Contents