HP StorageWorks D2200sb Maintenance And Service Manual page 22

Pcie storage blade
Hide thumbs Also See for StorageWorks D2200sb:
Table of Contents

Advertisement

Power down the partner server blade
In systems that use the storage blade as external data storage, be sure that the partner server blade is the first
unit to be powered down and the last to be powered back up. Taking this precaution ensures that the system
and the OS are shut down in an orderly manner.
IMPORTANT:
To power down the storage blade, power down the partner server blade. See the server blade
documentation.
Remove the storage blade
WARNING:
internal system components to cool before touching them.
CAUTION:
before beginning any installation procedure. Improper grounding can cause ESD.
To remove the component:
Identify the proper storage blade.
1.
Power down the partner server blade (on page 22).
2.
If the partner server blade is a full-height server blade, do one of the following:
3.
Remove the blank installed above the storage blade.
o
Remove the half-height device installed above the storage blade.
o
For information about removing a half-height device, see the half-height device user guide.
Remove the storage blade:
4.
If installing a hot-plug device, it is not necessary to power down the storage blade.
To reduce the risk of personal injury from hot surfaces, allow the drives and the
To prevent damage to electrical components, properly ground the storage blade
Removal and replacement procedures 22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents