YASKAWA V1000 Installation Manual page 21

Ac drive option, cc-link
Hide thumbs Also See for V1000:
Table of Contents

Advertisement

5 Installation Procedure
3.
After the terminal block is fully attached to the option unit, tighten the screws on the
left and right sides of the terminal block. (Tightening torque: 0.22 to 0.25 (N m))
Note: Be sure to put the option cover back on after you have completed all necessary wiring.
Figure 12
Communication Cable Specifications
Use only CC-Link dedicated cable. Warranty does not cover other cable types. For
information of cables, refer to the CC-Link website at http://www.cc-link.org/.
Terminal Resistor Connection
When the CC-Link Option is the last station connected in a CC-Link network, the terminal
resistor needs to be set to that CC-Link Option. Follow the instructions below.
1.
Cut the terminal resistor tube as shown.
Note: For the terminal resistor, either use what is already built into the master unit, or use a standard-
market resistor of 110 Ω, ±5% (1/2 W).
Figure 13
22
Figure 13 Terminal Block Installation
jumper
cut
Figure 14 Terminal Resistor
YASKAWA ELECTRIC TOBP C730600 22B V1000 Option CC-Link Installation Manual
screwdriver blade size
up to
3.5 mm
blade width
up to 0.6 mm
cut here

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Si-c3/v

Table of Contents