GE 26976 User Manual page 12

900 mhz under the counter call waiting caller id speakerphone/answering system
Hide thumbs Also See for 26976:
Table of Contents

Advertisement

----add drawing showing how the base gets mounted under the cabinet---
---
Fig. 11
M
OUNTING
1. If your cabinet does not have an overhang:
a) Position the template in the desired location on the underside of
the cabinet, flush with the front edge of the cabinet.
b) Tape the template in place and go to step 2.
If your cabinet has an overhang:
a) Measure the thickness of the overhang.
b) Fold the front of the template downward along the printed
guideline closest to the thickness of your cabinet.
c) Tape folded-down portion to backside of the overhang, and tape
the template to the cabinet underside.
NOTE: If your cabinet has glue blocks or other obstructions, cut out
corresponding areas on the template to clear them. Do not cut out or
cut through the screw holes in the Template.
CAUTION: We recommend safety glasses be worn while
drilling screw holes to prevent the possibility of eye injury.
2. Drill three 1/4" diameter holes through the underside of the cabinet.
TIP: On wooden cabinets you may want to mark and start the drill
holes with a nail or an awl. Be sure to hold the drill very firmly against
the cabinet.
12
P
ROCEDURE
Fig. 12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents