PRE-INSTALLATION INSPECTION OF EQUIPMENT

All units are factory tested to ensure safe operation and qual-
ity assembly. Units are packaged and sealed on shipping
skids and shipped in first class condition. Torn and broken
packaging, scratched or dented panels should be reported to
carrier immediately. Internal inspection of all units should be
performed prior to installation. Remove all access doors and
check for visual defects that can occur during transport. Any
problems found internally should be reported to carrier and
manufacturer immediately. Refrigerant circuit should be
checked to ensure no leaks have occurred during shipment.
Install gauge set to high and low pressure ports to confirm
pressure has been maintained and no leaks have occurred
during shipment. Repair any damage prior to installation to
ensure safe operation.
NOTE: Record any unit damage on the Bill of Lading and
report to carrier and factory immediately. Shipping and han-
dling damages are not warranty items.

RIGGING

4
WARNING
PRIOR TO MOUNTING UNIT, CHECK INDIVID-
UAL UNIT WEIGHTS AND VERIFY LIFTING
CAPACITY OF LIFTING EQUIPMENT EXCEEDS
WEIGHT OF UNITS BY SAFE MARGINS. FAIL-
URE TO DO SO MAY RESULT IN UNIT DAM-
AGE, PERSONAL INJURY OR EVEN DEATH.
WARNING
DETERMINE THE ACTUAL CENTER OF GRAV-
ITY OF THE UNIT BY PERFORMING A TEST
LIFT. LIFTING AN UNBALANCED UNIT CAN
CAUSE PERSONAL INJURY OR EVEN DEATH.
Units are not built to accommodate rigging of chains for lift-
ing. Please use straps to insure proper lift. See WARNINGS: