Unpack The System; Rails And Cable Management Assembly; Warning About Lifting The System - Dell DD6300 Hardware Overview And Installation Manual

Emc data domain systems
Hide thumbs Also See for DD6300:
Table of Contents

Advertisement

Install the System in the Rack

Unpack the system

Rails and cable management assembly

Data Domain DD6300, DD6800, and DD9300 Systems 6.1 Hardware Overview and Installation Guide
40
1. Remove the accessories and rail mount kit from the shipping packages.
2. Remove the controller and the bezels from the shipping packages.
CAUTION
Data Domain systems are heavy. Always use two people or a mechanical lift to
move a system.
Figure 10 Warning about lifting the system
3. Remove expansion shelves and their bezels from the shipping packages.
The rail kit is universal in that it supports all rack mounting hole types and sizes. Both
the front and the rear ends of the rail kit contain threaded posts that come with a cap
installed. The cap fits square and round hole unthreaded racks. Large flat headed M4
screws insert through the rail into the rail kit to secure the rail to the rack.
When installing rails, do not tighten the screws all the way until all the screws are in
place. This assures that the screws are all screwed in the same distance, and prevents
one from skewing the others.
The rail kit includes two bracket assemblies, one marked for the left side and one
marked for the right side of the rack.
A cable management assembly (CMA), for organization of cables at the rear of the
system, is already installed onto the system on a Data Domain rack. For field installed
systems, the CMA is shipped with the system.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dd6800Dd9300

Table of Contents