Baxi Power HT 1.850 Installation, Operation And Maintenance Manual page 80

Power ht series. floor standing condensing gas boilers
Hide thumbs Also See for Power HT 1.850:
Table of Contents

Advertisement

Available languages

Available languages

IT
Parameter
Parameter description
AT
N.
P1
Time of day setting
GB
P5
Minimum central heating temperature setting (°C)
P11
Start of first daily period of automatic central heating
P12
End of first daily period of automatic central heating
P13
Start of second daily period of automatic central heating
P14
End of second daily period of automatic central heating
P15
Start of third daily period of automatic heating
P16
End of third daily period of automatic central heating
*
P31
Start of first daily period of domestic hot water production
*
P32
End of first daily period of domestic hot water production
*
P33
Start of second daily period of domestic hot water production
*
P34
End of second daily period of domestic hot water production
*
P35
Start of third daily period of domestic hot water production
*
P36
Fine End of third daily period of domestic hot water production
P45
Reset of daily central heating and domestic hot water production programs (factory settings).
Press the - + keys together for about 3 seconds; the number 1 appears on the display.
Confirm by pressing either of the
*
Parameters for program lines P31 to P36 are displayed only if
rameter H91 see section 14) is activated.
3.7 TABLE FO USER-SETTABLE PARAMETERS
keys
ISTRUCTIONS PERTAINING TO THE USER
Domestic Hot Water
80
Factory
Range
setting
———-
0...23:59
25
25..80
6:00
00:00...24:00
22:00
00:00...24:00
0:00
00:00...24:00
0:00
00:00...24:00
0:00
00:00...24:00
0:00
00:00...24:00
0:00
00:00...24:00
24:00
00:00...24:00
0:00
00:00...24:00
0:00
00:00...24:00
0:00
00:00...24:00
0:00
00:00...24:00
0
0...1
(D.H.W.) program (pa-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents