Raypak 1001 Operating And Installation Manual page 9

H, wh, p series advanced design boiler
Table of Contents

Advertisement

Raypak Advanced Design Boilers are design certified by AGA/CGA for outdoor installation. Roof water drainage must be
diverted away from boilers installed under overhangs.
TABLE 2
OUTDOOR INSTALLATION MINIMUM CLEARANCES
Boiler Side
Rear
Right
Left
Top
Vent
WARNING:
Combustion air inlet (blower air inlet) should have 6" minimum clearance from any obstruction, i.e. walls or
other appliances.
Boiler Size
751, 1001, 1501
6"
36" (Water side)
36"
0"
1"
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1501751

Table of Contents