Siemens SCALANCE W788-1 Operating Instructions Manual page 25

Scalance w788 series simatic net industrial wireless lan
Table of Contents

Advertisement

Installing on the DIN rail
The following figure shows the W7x8 mounted on a DIN rail. Follow the steps outlined below:
1. Place the device on the upper edge of the DIN rail (position A).
2. Pull the spring-mounted DIN rail slider (position B) down and press the device against the
DIN rail until it locks in place.
Figure 5-4
SCALANCE W788-x / W748-1
Operating Instructions, 06/2016, A5E03678333-10
Installing on a DIN rail
Mounting
5.4 Installing on a DIN rail
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scalance w788-2Scalance w748-1

Table of Contents