Benchmark Commissioning And Servicing Section - Biasi ADVANCE 25C User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for ADVANCE 25C:
Table of Contents

Advertisement

11

BENCHMARK COMMISSIONING AND SERVICING SECTION

It is a requirement that the boiler is installed and commissioned to the manufacturers instruc-
tions and the data fields on the commissioning checklist completed in full.
To instigate the boiler guarantee the boiler needs to be registered with the manufacturer
within one month of the installation.
To maintain the boiler guarantee it is essential that the boiler is serviced annually by a Gas
Safe Registered Engineer who has been trained on the boiler installed.
The service details should be recorded on the Benchmark Service Interval Record and left
with the householder.
www.centralheating.co.uk

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Advance 30cAdvance 35c

Table of Contents