Venting Practices; Vent Piping Guidlines - Lennox ML193UH Installation Instructions Manual

Meritseriies gas furnace up/flow horizontal air discharge
Table of Contents

Advertisement

8 - After assembly, wipe excess cement from pipe at
end of fitting socket. A properly made joint will show
a bead around its entire perimeter. Any gaps may
indicate an improper assembly due to insufficient
solvent.
9 - Handle joints carefully until completely set.

Venting Practices

Piping Suspension Guidelines
SCHEDULE 40
PVC - 5'
all other pipe* - 3'
* See Piping and Fittings Specifications table
NOTE - Isolate piping at the point where it exits the outside wall or
roof in order to prevent transmission of vibration to the structure.
Wall Thickness Guidelines
24" maximum
3/4" minimum
n i
s
d i
e
FIGURE 20
1 - In areas where piping penetrates joists or interior
walls, hole must be large enough to allow clearance
on all sides of pipe through center of hole using a
hanger.
2 - When furnace is installed in a residence where unit
is shut down for an extended period of time, such
as a vacation home, make provisions for draining
condensate collection trap and lines.
Exhaust Piping (FIGURE 24 and FIGURE 25)
Route piping to outside of structure. Continue with instal-
lation following instructions given in piping termination
section.
Wall
o
u
s t
d i
e
Page 16
REPLACING FURNACE THAT WAS PART OF A
COMMON VENT SYSTEM
CHIMNEY
OR GAS
VENT
(Check sizing
for water
heater only)
FURNACE
(Replaced)
If replacing a furnace which was
commonly vented with another gas appliance, the size
of the existing vent pipe for that gas appliance must be
checked. Without the heat of the original furnace flue
products, the existing vent pipe is probably oversized for
the single water heater or other appliance. The vent
should be checked for proper draw with the remaining
appliance.
FIGURE 21
CAUTION
Do not discharge exhaust into an existing stack or
stack that also serves another gas appliance. If vertical
discharge through an existing unused stack is required,
insert PVC pipe inside the stack until the end is even
with the top or outlet end of the metal stack.
CAUTION
The exhaust vent pipe operates under positive pressure
and must be completely sealed to prevent leakage of
combustion products into the living space.

Vent Piping Guidlines

NOTE - Lennox has approved the use of DuraVent® and
Centrotherm manufactured vent pipe and terminations
as an option to PVC. When using the PolyPro® by Du-
raVent or InnoFlue® by Centrotherm venting system the
vent pipe requirements stated in the unit installation in-
struction – minimum & maximum vent lengths, termination
clearances, etc. – apply and must be followed. Follow the
instructions provided with PoyPro by DuraVent and Inno-
Flue by Centrotherm venting system for assembly or if re-
quirements are more restrictive. The PolyPro by Duravent
and InnoFlue by Centrotherm venting system must also
follow the uninsulated and unconditioned space criteria
listed in table 7.
WATER
HEATER
OPENINGS
(To Adjacent
Room)

Advertisement

Table of Contents
loading

Table of Contents