Lockout Due To Ignition Failure - Riello 40 GS3 Installation, Use And Maintenance Instructions

Forced draught gas burner
Table of Contents

Advertisement

6.5.2

Lockout due to ignition failure

P
TL
t
2
t
1
M
AD
t3d
M
M
I
V
SO
LED
6.5.3
Lockout due to a flame or flame simulation
detected during pre-purging
P
TL
t
2
t
1
M
AD
t
3d
M
M
I
V
SO
LED
Operating times (in seconds)
t1, t3l, t4l, t4a
t2l
max
max
1
30
Start-up, calibration and operation of the burner
t
3
t
4i
t
s
Lockout
Green
Red
t
3
t
s
Lockout
Green
Red
t2, t4i
t2a
-
-
3
120
Key (Fig. 21)
I
LED
M
SO
TL
V
AD
.
D7401
Key (Fig. 22)
I
LED
M
SO
TL
V
AD
D7402
t3
t3a
-
max
40
15
23
GB
Ignition transformer
Reset button LED indicating operating status
Fan motor
Ionisation probe
Limit thermostat
Gas valve
Air damper opening motor
Red (LED signalling)
Green (LED signalling)
Ignition transformer
Reset button LED indicating operating status
Fan motor
Ionisation probe
Limit thermostat
Gas valve
Air damper opening motor
Red (LED signalling)
Green (LED signalling)
t3d
t3r
-
max
4
70
Fig. 21
Fig. 22
ts
t6
-
max
5
360
Tab. G
20063754

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents