ABB EXCOUNT-II User Manual page 12

Hide thumbs Also See for EXCOUNT-II:
Table of Contents

Advertisement

Transceiver menu system
Progress bar
12
1.3.3 Resistive leakage current
measurement *
Select sensor ID to read data from with the
Start the reading by pressing
Before the transmission begins the operating voltage
must be given. (see 1.3.3.1)
Error code
A successful transmission is marked with
A failed transmission is marked with
If the transmission was unsuccessful, an error code
will be displayed.
Back to read data menu
* ) Not available in all versions.
1.3.3.1 Operating voltage *
The actual operating voltage must be given when
measuring the resistive leakage current.
The system voltage is displayed as a default value.
Adjust the value to the actual value with
and
Enter the correct value by pressing
NOTE! If the system is 3-phase, the value should
be the actual phase-phase voltage. Otherwise, for
1-phase systems, the value should be the phase-
ground voltage.
The progress bar will indicate that the transmission
has begun.
* ) Not available in all versions.
2501en EXCOUNT-II Users Manual
)
keys.
key.
)