Bale Clasp Sfp Or Sfp+ Module - Cisco NCS 5501 Hardware Installation Manual

Ncs 5500 series fixed-port routers
Table of Contents

Advertisement

Installing and Removing SFP Modules
Protect the SFP or SFP+ modules by inserting clean dust covers into them after the cables are removed.
Caution
Be sure to clean the optic surfaces of the fiber cables before you plug them back into the optical ports of
another module. Avoid getting dust and other contaminants into the optical ports of your SFP or SFP+
modules, because the optics do not work correctly when obstructed with dust.
We strongly recommended that you do not install or remove the SFP or SFP+ module with fiber-optic
Caution
cables attached to it because of the potential to damage the cable, the cable connector, or the optical
interfaces in the module. Disconnect all cables before removing or installing an SFP or SFP+ module.
Removing and inserting an module can shorten its useful life, so you should not remove and insert modules
any more often than is absolutely necessary.
When installing an SFP or SFP+ module, you should hear a click as the triangular pin on the bottom of
Note
the module snaps into the hole in the receptacle, indicating that the module is correctly seated and secured
in the receptacle. Verify that the modules are completely seated and secured in their assigned receptacles
on the line card by firmly pushing on each SFP or SFP+ module.

Bale Clasp SFP or SFP+ Module

The bale clasp SFP or SFP+ module has a clasp that you use to remove or install the module (see the figure
below).
Figure 20: Bale Clasp SFP or SFP+ Module
Hardware Installation Guide for Cisco NCS 5500 Series Fixed-Port Routers
40
Connect Router to the Network

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncs 5502Ncs 5501 seNcs 5502 seNcs 55a1-24hNcs 55a1-36h

Table of Contents