Receiving Inspection - Fluke 481 Operator's Manual

Ion chamber survey
Hide thumbs Also See for 481:
Table of Contents

Advertisement

481
Operators Manual
1.2
1.1
1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
1
0

Receiving Inspection

Upon receipt of the Survey Meter:
1. Check the shipping cartons(s) and their contents for in-shipment damage.
2. Check that all items listed on the packing slip are present and in good
If damage is evident, make a claim with the carrier and contact Fluke
immediately. If items are missing, contact Fluke. See the How to Contact Fluke
section in this manual.
8
Model 481B Typical Energy Dependence
condition.
1
0
0
Effective (keV)
Side
Slide - Closed
Slide - Open
1
0
0
0
1
0
0
0
0
gpl03.eps

Advertisement

Table of Contents
loading

Table of Contents