Power-On And Power-Off; Debugging - Zte W800A Installation Instructions Manual

Ip wireless access system; wireless access point
Table of Contents

Advertisement

ZXR10 WAS (V2.0) IP Wireless Access System W800A Wireless Access Point
b) Gluing together by using permanent, fast-setting epoxy glue and surround the
entire periphery of the connector junction so it is not possible to disconnect.
Follow the directions provided on the glue package for cleaning and mixing the
two-part glue together.

2.3 Power-on and Power-off

The following two power methods are used for the W800A system.
1.
2.
The terminal PoE module is embedded in the W800A. When PoE power supply is
adopted, a standard straight-through cable is used to connect the PoE interface of the
PoE source end device W112P or W105P. For the detailed description, refer to
Appendix B.
To power on the W800A, connect the power adapter or Ethernet cable for powering the
Ethernet for the W800A. After being powered on, the W800A will start automatically,
without any operation by users.
To power off the W800A, directly disconnect the W800A power adapter or the cable
for powering Ethernet.

2.4 Debugging

After W800A is powered on and started, it is required to implement service debugging.
There are three purposes for debugging:
Professional Installation Instruction Manual
Fig. 2.22-2 Soldered Connectors
Use the in-house power adapter of the W800A.
Use PoE.
2-6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zxr10

Table of Contents