Planet IGS-620TF User Manual page 29

Industrial 4-port 10/100/1000base-t + 2-slot 100/1000base-x sfp ethernet switch
Table of Contents

Advertisement

Installation Steps
Step 1: Unpack the Industrial Gigabit Ethernet Switch.
Step 2: Check whether the DIN-Rail is screwed on the Industrial
Gigabit Ethernet Switch. (Please refer to DIN-Rail Mounting
section for DIN-Rail installation if the DIN-Rail is not
screwed on the Industrial switch). If you want to wallmount
the Industrial Gigabit Ethernet Switch, please refer to the
Wallmount
installation.
Step 3: To hang the Industrial Gigabit Ethernet Switch on the
DIN-Rail
Installation section.
Step 4: Power on the Industrial Gigabit Ethernet Switch (Please refer
to the Wiring of the Power Inputs section for power input).
The power LED on the Industrial Gigabit Ethernet Switch will
light up. Please refer to the LED Indicators section for LED
status.
Step 5: Prepare the twisted-pair, straight-through Category 5 cable
for Ethernet connection.
Step 6: Insert one side of Category 5 cables into the Industrial
Gigabit Ethernet Switch Ethernet port (RJ45 port) while
the other side of category 5 cable to the network devices'
Ethernet port (RJ45 port), eg. switch, PC or Server. The UTP
port (RJ45) LED on the Industrial Gigabit Ethernet Switch
will light up when the cable is connected with the network
device. Please refer to the LED Indicators section for the
functions of LED status.
Step 7: When all the connections are all set and all LED lights show
normally, the installation is complete.
Plate
Mounting
track
or
wall,
section
for
wallmount
please
refer
to
plate
the
Mounting
29

Advertisement

Table of Contents
loading

Table of Contents