Defrost Control - Daikin F-Series Service Manual

Inverter multi for 2 rooms
Hide thumbs Also See for F-Series:
Table of Contents

Advertisement

Control Specification
2.10

Defrost Control

Outline
Heat Pump Only
Defrosting is carried out by the cooling cycle (reverse cycle). The defrosting time or outdoor
heat exchanger temperature must be more than its fixed value when finishing.
Detail
Conditions for Starting Defrost
The starting conditions must be made with the outdoor air temperature and heat exchanger
temperature. Under the conditions that the system is in heating operation, 6 minutes after the
compressor is started and more than 30 minutes of accumulated fine pass since the start of the
operation or ending the defrosting.
Conditions for Canceling Defrost
The judgment must be made with heat exchanger temperature. (4°C~12°C)
84
Frequency
60sec.
ON
Compressor
OFF
ON
Four way valve
OFF
ON
Fan
OFF
Operating room
450pls
electronic expansion
valve opening
Operation stopped room
140pls
electronic expansion
valve opening
0Hz
120sec.
530 sec.
5sec.
350pls
160pls
SiBE12-712
PI control
30sec.
5sec.
450pls
Initial opening
Initial opening
0pls
(R7030)
Function and Control

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents