Leak Testing The System - Lennox XC25-024-230-01 Installation And Service Procedure

Xc25 series
Table of Contents

Advertisement

INSTALLING ISOLATION GROMMETS
Locate the isolation grommets (provided). Slide grommets
onto vapor and liquid lines. Insert grommets into piping
panel to isolate refrigerant lines from sheet metal edges.
SUCTION LINE
LIQUID LINE
TWO ISOLATION GROMMETS ARE
PROVIDED FOR THE LIQUID AND
SUCTION LINE PIPE PANEL PASS
THROUGH.
REAR VIEW OF UNIT EXTERIOR
Figure 10. Isolation Grommets
IMPORTANT
The Environmental Protection Agency (EPA) prohibits
the intentional venting of HFC refrigerants during
maintenance, service, repair and disposal of appliance.
Approved methods of recovery, recycling or reclaiming
must be followed.
PIPING PANEL
21
IMPORTANT
If this unit is being matched with an approved line set
or indoor unit coil which was previously charged with
mineral oil, or if it is being matched with a coil which was
manufactured before January of 1999, the coil and line
set must be flushed prior to installation. Take care to
empty all existing traps. Polyol ester (POE) oils are
used in Lennox units charged with HFC-410A
refrigerant. Residual mineral oil can act as an insulator,
preventing proper heat transfer. It can also clog the
expansion
device,
and
performance and capacity.
Failure to properly flush the system per the instructions
below will void the warranty.

Leak Testing the System

IMPORTANT
Leak detector must be capable of sensing HFC
refrigerant.
WARNING
Refrigerant can be harmful if it is inhaled. Refrigerant
must be used and recovered responsibly.
Failure to follow this warning may result in personal injury
or death.
reduce
the
system
XC25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xc25-036-230-01Xc25-048-230-01Xc25-060-230-01Signature xc25 seriesSignature xc25-024-230-01Signature xc25-036-230-01 ... Show all

Table of Contents