Lennox XC25-024-230-01 Installation And Service Procedure page 17

Xc25 series
Table of Contents

Advertisement

1
PIPING PANEL REMOVAL AND LINE SET
PREPARATION
Remove piping panel for easier access to service valves. Cut ends
of the refrigerant lines square (free from nicks or dents) and debur
the ends. The pipe must remain round. Do not crimp end of the line.
CUT AND DEBUR
SERVICE VALVE
CONNECTION
COPPER TUBE
STUB
REDUCER
REFRIGERANT LINE
DO NOT CRIMP SERVICE
VALVE CONNECTOR WHEN
PIPE IS SMALLER THAN
CONNECTION
3
ATTACH THE MANIFOLD GAUGE SET FOR BRAZING
LIQUID AND SUCTION LINE SERVICE VALVES
A.
Connect gauge set low pressure side to liquid line
service valve (service port).
B.
Connect gauge set center port to bottle of nitrogen
with regulator.
C.
With valve core removed from the suction line service
port, nitrogen flow will have an exit point.
SUCTION SERVICE PORT MUST BE OPEN AND
SERVICE PORT CORE REMOVED TO ALLOW
EXIT POINT FOR NITROGEN FLOW
LINE SET SIZE MATCHES
SERVICE VALVE CONNECTION
LINE SET SIZE IS SMALLER
THAN CONNECTION
SUCTION LINE
INDOOR
UNIT
LIQUID LINE
Figure 8. Brazing Procedures
2
CAP AND CORE REMOVAL
Remove service cap and core from both the suction and liquid line
service ports.
SUCTION LINE SERVICE
VALVE
LOW
ATTACH
GAUGES
C
SUCTION LINE
SERVICE VALVE
A
LIQUID LINE SERVICE
VALVE
17
SERVICE PORT CAP
SERVICE PORT
CORE
LIQUID LINE SERVICE VALVE
SERVICE PORT
CORE
SERVICE
PORT CAP
HIGH
B
OUTDOOR
UNIT
NITROGEN
XC25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xc25-036-230-01Xc25-048-230-01Xc25-060-230-01Signature xc25 seriesSignature xc25-024-230-01Signature xc25-036-230-01 ... Show all

Table of Contents