2.5
Response to setpoint changes and disturbances
Response to setpoint changes
The process value should follow a setpoint change as quickly as possible. The response to
setpoint changes is improved by minimizing fluctuation of the process value and the time
required to reach the new setpoint.
x
w
PID control
Function Manual, 03/2017, A5E35300227-AC
2.5 Response to setpoint changes and disturbances
Process value
Setpoint
Principles for control
27