r
1
ncluded).
2
3
4
DAP-3320 Install Guide
Hardware Overview
1
Press and hold for six seconds to reset the access point
Reset Button
to the factory default settings. The LED will turn on for
two seconds and then begin the reboot process.
A solid green light indicates the device is powered
Power LED
and operational.
Power is supplied to this port via an Ethernet cable
LAN (PoE) Port
that is connected to a PoE injector or a PoE switch.
Connect a grounding wire to help prevent device
Ground
damage due to shorts and lightning strikes.
2
3
4
3