Unpack; Unpack Procedure; Items Supplied - Omron NYB17-*100 SERIES User Manual

Ipc without operating system ny-series
Table of Contents

Advertisement

5 Installation
5-1

Unpack

This section provides details on how to unpack the Box PC Without Operating System.
5-1-1

Unpack Procedure

1
Check the package for damage.
If there is any visible damage:
• Take photos of the package and save them.
• Inform your supplier immediately.
2
Open the package.
Ensure not to damage the contents.
3
Ensure that all items are present.
Additional Information
Refer to 5-1-2 Items Supplied on page 5 - 2 for the items supplied.
5-1-2

Items Supplied

The Industrial Box PC is supplied with several items.
Additional Information
• Refer to Items Supplied with the Industrial Box PC on page 5 - 3 for more details.
• Refer to Items Supplied with the Brackets on page 5 - 4 for more details.
5 - 2
NY-series Industrial Box PC Without Operating System User's Manual (W586)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nyb1c-*100 seriesNyb25-*100 series

Table of Contents