Securing Outdoor Unit to Slab, Frame, or Rails
If the outdoor unit is installed on a field-provided slab or
frame, use lag bolts or equivalent to secure the outdoor
unit to the slab or frame.
Four Field-provided Anchor Bolts
Figure 13. Securing Outdoor Unit to Slab
Figure 14. Securing Outdoor Unit to Rails
Securing Outdoor Unit To Hanging Brackets
If the outdoor unit is installed on field-provided wall
mounting brackets, use lag bolts or equivalent to secure
the outdoor unit to the bracket. Minimum rear clearance
can be reduced to 6 inches (152 mm) when mounted
on brackets and with no obstructions on the other three
sides. Allow for condensate disposal when placing units
above one another.
Air Outlet
Figure 15. Securing Outdoor Unit to Brackets

Refrigerant Piping Connections

Field piping consists of two copper lines connecting
the outdoor unit to the indoor unit. "Table 1. Torque
Requirements" lists the connection sizes. The connections
are made using the provided brass flare nuts at the end of
the refrigerant piping connections.
Four Field-Provided
Anchor Bolts
6 in
152 mm
Air Inlet
Both lines must be individually insulated.
1. The seal on the unit refrigerant piping connections
should remain in place until the last possible moment.
This will prevent dust or water from getting into the
refrigerant piping before it is connected.
2. CAREFULLY adjust refrigerant piping connections to
suit the application.
3. Slowly loosen one of the flare nuts to release the
factory nitrogen charge from the indoor units only.
4. Remove the flare nuts from the connections on the
unit and discard the seal from each of the piping
connections.
5. Slide the flare nuts onto the ends of the field-provided
refrigerant piping before using a suitable flaring tool to
flare the end of the copper pipe.
6. Apply recommended HFC-410A refrigerant lubricant
to the outside of the flared refrigerant lines.
IMPORTANT
The
compressor
oil
(Polyvinylether).
hydrofluorocarbon (HFC) refrigerants, such as HFC-
410A, which this system contains. While it may have
some miscibility properties with mineral-based oil and
POE oil (Polyolester), it is not recommended to mix PVE
oil with any other type of refrigerant oil.
7. Align
the
threaded
flared refrigerant lines. Tighten the flare nuts
lightly at first to obtain a smooth match as
illustrated
in
"Figure
(Male to Female Connection)" on page 9.
8. Once snug, continue another half-turn on each nut
which should create a leak-free joint. A torque wrench
may be used to tighten flare nuts using "Table 3.
Flare Nut Torque Recommendations" on page 9
recommendations. Do not over-tighten a flared joint.
Flared connections should always be accessible
and must be insulated to prevent condensation.
9. After refrigerant piping has been installed and checked
for leaks, apply insulation over all flared connections.
Table 2.
Refrigerant Piping and Indoor Unit
Connection Sizes
Size
(Btuh)
9000
12000
18000
24000
8
in
this
unit
contains
PVE
oil
is
formulated
connections
16.
Making
Connections
Liquid Line
Gas Line
in.
in.
1/4
3/8
1/4
1/2
1/4
1/2
3/8
5/8
PVE
for
with
the

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents