2 - PROGRAMMING
Regeneration time (RT)
This parameter is identified by the letters RT. It specifies the time of day the system will initiate
a regeneration. In immediate volumetric mode, the system will not take this parameter into
account.
ex.: regeneration at 2:00 AM
Regeneration cycles
The settings 10.1 to 10.4 enable the regulation of the regeneration cycle times.
The amount of cycles is established by the piston type.
ex.: Backwash
Brine draw and slow rinse
Rapid rinse
Brine refill
In case of double backwash regeneration [dF2b], cycles will be:
ex. : First backwash
Brine draw & slow rinse
Second backwash
Rapide rinse
Brine fill
Define days of regeneration in the week
Only viewed in 7 days time clock mode [dAY]
This parameter is identified by the letter D. It allows you to select the days of the week that
trigger regeneration. If every day is set to OFF, the valve does not regenerate and displays an
error code Err2 after 8 days. To clear this error display: settle at least one day of the week and /
or trigger a manual regeneration.
Note: the electronic will require at least one day to be set on.
ex.: - regeneration on Monday
- no regeneration on Tuesday and Wednesday
- regeneration on Friday
Input the current day of the week in order for the valve to work correctly.
ex. : day of installation Thursday
10 min
60 min
10 min
12 min
Regeneration Cycles
1. BW
Backwash
2. BD
Brine draw
3. RR
Rapid rinse
4. BF
Brine fill
10 min
60 min
5 min
10 min
12 min
Regeneration cycles
1. B1
Backwash
2. BD
Brine draw
3. B2
2nd Backwash
4. RR
Rapid rinse
5. BF
Brine fill
ELECTRONIC SXT