Switching The Server On And Off - Fujitsu PRIMERGY RX1330 M3 Operating Manual

Hide thumbs Also See for PRIMERGY RX1330 M3:
Table of Contents

Advertisement

6.3

Switching the server on and off

V
CAUTION!
If nothing appears on the screen but flickering stripes after switching
on the server, switch the server off immediately (see chapter
"Troubleshooting and tips" on page
The On/Off button does not disconnect the server from the mains
voltage. To completely disconnect it from the mains voltage, remove
all power plug(s) from the socket(s).
Do not move, strike, or shake the server when it is turned on. This
can damage the hard disk in the server and cause data loss.
Turn the server on when the temperature is in its operating
environment range (10–35°C). For details on the operating
environment, refer to "Safety Precautions". When operating the
device outside of this operating environment, the server may
operate improperly and data loss may occur. Furthermore, Fujitsu
cannot be held responsible for any related damage, malfunction, or
loss of data, etc.
Be sure to wait for 10 seconds or more after shutdown before
turning the server on again.
After connecting all power cords, wait at least 60 seconds before
pressing the On/Off button.
Switching the server on
The AC connected indicator lights up green (standby mode) when the server is
connected to the mains.
I
It takes about 60 seconds until power-on becomes possible.
– Starting up for the first time:
For Japan, please refer to " は じ めにお読み く だ さ い " as well.
Ê Press the On/Off button.
Ê Insert ServerView Suite DVD in the ODD.
RX1330 M3
79).
Operating Manual
Starting up and operation
71

Advertisement

Table of Contents
loading

Table of Contents